Unlike the Red Book, where the Employer provides the design, the Yellow Book requires the Contractor to design the works based on the "Employer's Requirements". This shifts the risk of design failure primarily to the contractor.
Taking Over, Defects Liability.
The project is administered by an independent Engineer, who acts on behalf of the Employer but is required to act neutrally when determining claims. Key Changes in the 2017 Edition vs. 1999 Edition fidic yellow book pdf 2017
| Телефон * | |